Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Inset Slab | HS 4b ** | Lead rpt | 29 May | Flimston Bay | |||
Bow-Shaped Slab | HS 4b *** | Lead rpt | 29 May | Flimston Bay | |||
Mast Gully Ridge | VD * | 2nd | 27 May | Birchen Edge | |||
Fo'c'sle Crack | S 4b * | 2nd | 27 May | Birchen Edge | |||
Stoker's Hole | HS 4a * | 2nd | 27 May | Birchen Edge | |||
Sailor's Problem | VD | 2nd | 27 May | Birchen Edge | |||
Nautical Crack | VD * | Lead O/S | 27 May | Birchen Edge | |||
Reef Knot | S 4b * | 2nd | 27 May | Birchen Edge | |||
Quarry Wall | HS 4c * | TR dog | 25 May | Baslow Edge | |||
Whatisit? | HVS 5b * | TR dnf | 25 May | Baslow Edge | |||
Route 0 | D | TR | 25 May | Baslow Edge | |||
Route 1.5 | S 4b | TR | 25 May | Baslow Edge | |||
Route 1 | VD * | TR | 25 May | Baslow Edge | |||
Chipped Slab | D | TR | 25 May | Baslow Edge | |||
Trapeze | VD ** | Lead O/S | 25 May | Froggatt Edge | |||
Allen's Slab | S 4a ** | Lead O/S | 25 May | Froggatt Edge | |||
Gamma | VD | Lead O/S | 25 May | Froggatt Edge | |||
Slab Recess | D ** | Lead O/S | 25 May | Froggatt Edge | |||
Rob's Crack | VS 4c *** | TR rpt | 3 May | Fairy Cave Quarry | |||
The Socialist | S 4a | Lead rpt | Bethan | 3 May | Fairy Cave Quarry | ||
Balch's Slide | HS 4a * | Lead O/S | Bethan | 3 May | Fairy Cave Quarry | ||
Halfway to Kansas | HS 4a | Lead rpt | Bethan | 3 May | Fairy Cave Quarry | ||
Sidewinder Split | HS 4a | Lead O/S | Andrew | 14 Oct, 2023 | Tryfan Fach [Little Tryfan] | ||
Central Slab Route | VD * | Lead rpt | Andrew | 14 Oct, 2023 | Tryfan Fach [Little Tryfan] | ||
Right Rib | S 4a * | Lead rpt | Andrew | 14 Oct, 2023 | Tryfan Fach [Little Tryfan] |