Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Boogie On Down | 6c ** | Lead RP | 9 Jul, 2009 | Torbryan Quarry | |||
Boogie On Down | 6c ** | TR RP | 4 Jul, 2009 | Torbryan Quarry | |||
Peggy Potato | 6b * | Lead rpt | 4 Jul, 2009 | Torbryan Quarry | |||
Mayday | 6c *** | Lead RP | 4 Jul, 2009 | Torbryan Quarry | |||
Fingerin' | HVS 5b * | Lead dog | graham knott | 30 Jun, 2009 | Sheeps Tor | ||
Wind Wall | HVS 5a * | 2nd rpt | graham knott | 30 Jun, 2009 | Sheeps Tor | ||
Flake-crack | f4 *** | Sent rpt | 28 Jun, 2009 | Cuckoo Rock and Combeshead Tor | |||
Hanging Flakes | f6B *** | Sent x | 28 Jun, 2009 | Cuckoo Rock and Combeshead Tor | |||
Wages of Fear | 6c+ * | TR dog | 25 Jun, 2009 | Torbryan Quarry | |||
Mayday | 6c *** | Lead dog | 25 Jun, 2009 | Torbryan Quarry | |||
Peggy Potato | 6b * | Lead dog | 25 Jun, 2009 | Torbryan Quarry | |||
Valhalla Wall Direct | E1 5b * | Lead β | Baz | 16 Jun, 2009 | The Dewerstone | ||
Silken Thread | HVS 5a | 2nd rpt | Baz | 16 Jun, 2009 | The Dewerstone | ||
Talk | 6a+ ** | Lead rpt | Henry | 14 Jun, 2009 | Blacknor South | ||
Do Ixtlan | 5b * | Lead rpt | Henry | 14 Jun, 2009 | Blacknor South | ||
Well Done Poppet | 5c * | Lead rpt | Henry | 14 Jun, 2009 | Blacknor South | ||
Ausfahrt | 6b+ *** | Lead dnf | 14 Jun, 2009 | Blacknor Central | |||
Driven Like the Snow | 6b+ ** | Lead O/S | Pete & Henry | 14 Jun, 2009 | Blacknor Central | ||
Pregnant Pause | 6a+ *** | Lead O/S | Pete & Henry | 14 Jun, 2009 | Blacknor Central | ||
Twang | E1 5b ** | Lead rpt | pedro.silva | 7 Jun, 2009 | Chudleigh Rocks - South Face | ||
The Fly | HVS 5a ** | Lead O/S | pedro.silva | 7 Jun, 2009 | Chudleigh Rocks - South Face | ||
Sheltered Wall | E2 5c * | TR rpt | Baz & Tony | 4 Jun, 2009 | Sheeps Tor | ||
Sheltered Arête | E1 5b * | TR O/S | Baz & Tony | 4 Jun, 2009 | Sheeps Tor | ||
Barking Crack | HVD * | Solo rpt | 4 Jun, 2009 | Sheeps Tor | |||
Slanting Crack | S 4a * | Solo rpt | 4 Jun, 2009 | Sheeps Tor |