Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
The Bolt Factory | 4c * | Lead O/S | Poz/Rob Lonsdale | 25 May, 2009 | Blacknor Beach | ||
Vertical Thrill | 4a * | Lead O/S | Poz/Rob Lonsdale | 25 May, 2009 | Blacknor Beach | ||
Sketchtastic | 3a * | Lead O/S | Poz/Rob Lonsdale | 25 May, 2009 | Blacknor Beach | ||
Suburban Dave | 3a * | Lead O/S | Poz/Rob Lonsdale | 25 May, 2009 | Blacknor Beach | ||
Tethered by Gravity | 4c * | TR O/S | Poz | 24 May, 2009 | Hedbury | ||
Bonsai | 3c | TR O/S | Poz | 23 May, 2009 | The Cuttings | ||
Arc Angel | 3a | TR O/S | Poz | 23 May, 2009 | The Cuttings | ||
On Manoeuvres | 3b | TR O/S | Colin Setterfield | 23 May, 2009 | The Cuttings | ||
We're Only Placing Bolts for Nigel | 3b | 2nd | Poz | 23 May, 2009 | The Cuttings | ||
Six Good Biceps | 4c ** | 2nd O/S | Poz | 22 May, 2009 | Blacknor Beach | ||
Fallen Slab Arête | 3a *** | 2nd O/S | Poz | 22 May, 2009 | Blacknor Beach | ||
Fallen Slab | 3a *** | 2nd O/S | Poz | 22 May, 2009 | Blacknor Beach | ||
Snail Crack | VD * | 2nd O/S | Poz | 13 May, 2009 | Lawrencefield | ||
Burgess Street | D | 2nd O/S | Poz | 12 May, 2009 | Burbage North | ||
Overhanging Buttress Direct | S 4a * | 2nd O/S | Poz | 12 May, 2009 | Burbage North | ||
Bypass | S 4a * | 2nd O/S | Poz | 3 May, 2009 | Subluminal and Lighthouse... | ||
High Street | D * | 2nd O/S | Poz | 3 May, 2009 | Subluminal and Lighthouse... | ||
Warm Afternoon | VD | Lead O/S | Poz | 25 Apr, 2009 | Stanage North | ||
Side Plate | S 4a | TR O/S | 25 Apr, 2009 | Stanage North | |||
Ice Cream Flakes | HVD | TR dog | 25 Apr, 2009 | Stanage North | |||
Youth | VD * | 2nd O/S | Poz | 25 Apr, 2009 | Stanage North | ||
Inspiration | S 4a * | 2nd | Poz | 24 Apr, 2009 | Cattle Troughs | ||
Chockney | VD 4a * | TR O/S | 11 Apr, 2009 | Cattle Troughs |