UKC

showing 1-25
UKH
Name Grade Style Date Crag name
Ledge Route II *** AltLd 30/Dec/17 Ben Nevis
Side Wall Flake f5 * Sent 02/Dec/17 Curbar Edge
Mini Prow f5 ** Sent 02/Dec/17 Curbar Edge
Mini Arête f4 * Sent 02/Dec/17 Curbar Edge
Mini Traverse f6A+ * Sent 02/Dec/17 Curbar Edge
Back Arête f5 * Sent 02/Dec/17 Curbar Edge
Diagonal f3+ * Sent 02/Dec/17 Curbar Edge
Cresent Slab f5+ * Sent 02/Dec/17 Curbar Edge
Crescent Slab Arête f4+ ** Sent 02/Dec/17 Curbar Edge
Track Crack f4+ * Sent 02/Dec/17 Curbar Edge
Trackside Scoop f4+ * Sent 02/Dec/17 Curbar Edge
Three Pocket Wall f5+ ** Sent 02/Dec/17 Curbar Edge
Crackside f6A * Sent 02/Dec/17 Curbar Edge
Side Wall Slot f6A * Sent 02/Dec/17 Curbar Edge
Side Wall Crack f4 * Sent 02/Dec/17 Curbar Edge
Side Wall Arête f4 * Sent 02/Dec/17 Curbar Edge
Aonach Eagach Ridge (winter) II *** Solo O/S 18/Nov/17 Aonach Eagach - Sgor nam...
Smooth Chimney Outside Route HS 4b Lead O/S 05/Nov/17 Brassington (Rainster Rocks)
Brassington Crack HVD * Lead O/S 05/Nov/17 Brassington (Rainster Rocks)
Arete Number 2 VD 4a Lead O/S 05/Nov/17 Brassington (Rainster Rocks)
Unleaded HS 4b 2nd O/S 29/Oct/17 Stanage Plantation
Hollybush Gully Right Direct S 4a * 2nd O/S 29/Oct/17 Stanage Plantation
Wall End Crack Direct HS 4b ** Lead RP 29/Oct/17 Stanage Plantation
North Ridge D *** AltLd dnf 23/Aug/17 Piz Badile
Meuli Route MVS 4b/c *** AltLd 15/Aug/17 Punta da l'Albigna