Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Inverted Staircase | D *** | 2nd O/S | 16 Jun, 2013 | Roaches Upper Tier | |||
Yong | HVD 4a ** | Lead O/S | 15 Jun, 2013 | Roaches Lower Tier | |||
Prow Corner | VD * | Lead O/S | 15 Jun, 2013 | Roaches Lower Tier | |||
Shepherd's Gully | MVS 4b ** | Lead O/S | 17 May, 2013 | Shepherd’s Crag | |||
Donkey's Ears | S 4a ** | Lead O/S | 17 May, 2013 | Shepherd’s Crag | |||
Centipede | S 4a ** | AltLd O/S | 15 May, 2013 | Raven Crag (Langdale) | |||
The Original Route | S 4a *** | AltLd O/S | 15 May, 2013 | Raven Crag (Langdale) | |||
Nameless | HS 4b | Lead O/S | 15 May, 2013 | Wallowbarrow Crag | |||
Visitors Only | HS 4a * | Lead O/S | 24 Sep, 2011 | Birchen Edge | |||
Topsail | VS 4c ** | Lead O/S | 24 Sep, 2011 | Birchen Edge | |||
The Prow | VS 4c * | Lead O/S | 24 Sep, 2011 | Birchen Edge | |||
Main Slab | S 4a ** | Lead O/S | 7 Aug, 2011 | Barmouth Slabs | |||
Zig Zag | VD ** | Lead O/S | 7 Aug, 2011 | Barmouth Slabs | |||
Crack 2 | D * | Lead O/S | 7 Aug, 2011 | Barmouth Slabs | |||
Slab 1 | VD * | Lead | 20 Jul, 2011 | Tryfan Fach [Little Tryfan] | |||
Ash Tree Slabs | VD *** | Lead | 22 Sep, 2010 | Gimmer Crag | |||
Lazarus | S 4a *** | Lead | 21 Sep, 2010 | Idwal Slabs (aka Cwm Idwal) | |||
Hope | VD *** | Lead | 21 Sep, 2010 | Idwal Slabs (aka Cwm Idwal) | |||
Tennis Shoe | HS 4b *** | Lead | 21 Sep, 2010 | Idwal Slabs (aka Cwm Idwal) | |||
Crack 3 | D * | Lead | 7 Aug, 2010 | Tryfan Fach [Little Tryfan] | |||
Overhanging Buttress Direct | S 4a * | Lead O/S | 27 Jun, 2010 | Burbage North | |||
Opposite | S 4a | Lead O/S | 27 Jun, 2010 | Bamford Edge | |||
Ammo | S 4a | Lead O/S | 27 Jun, 2010 | Bamford Edge | |||
Portside | S 4a | Lead O/S | 27 Jun, 2010 | Bamford Edge | |||
Bamford Buttress | S 4a * | Lead O/S | 27 Jun, 2010 | Bamford Edge |