Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Yobo | HS 4b * | Lead O/S | 5 Nov, 2012 | Maeshafn | |||
Puppy Power | VS 4b ** | Lead O/S | 5 Nov, 2012 | Maeshafn | |||
Ivy Crack | S 4a * | Lead O/S | 21 Oct, 2012 | World's End | |||
Jennifer Crack | HS 4a ** | Lead O/S | 21 Oct, 2012 | World's End | |||
Sting | HS 4a * | Lead O/S | 21 Oct, 2012 | World's End | |||
Quill | VS 4c * | Lead O/S | 21 Oct, 2012 | World's End | |||
Slick | VD ** | Lead O/S | 14 Oct, 2012 | Clogwyn yr Oen (Moelwyns) | |||
Talking Legs | E1 5b * | TR O/S | 13 Oct, 2012 | Pot Hole Quarry (Three... | |||
Snoozin' Suzie | VD ** | AltLd O/S | 8 Sep, 2012 | Symonds Yat | |||
Homoeopath | S * | Lead O/S | 8 Sep, 2012 | Symonds Yat | |||
Scatology | S | Lead O/S | 8 Sep, 2012 | Symonds Yat | |||
Esgaroth | HS 4b ** | Lead O/S | 7 Sep, 2012 | Goblin Combe | |||
Rob's Crack | VS 4c *** | 2nd O/S | 5 Sep, 2012 | Fairy Cave Quarry | |||
The Naked Civil Servant | E1 5b | Lead O/S | 5 Sep, 2012 | Fairy Cave Quarry | |||
Toblerone | E1 5b | Lead O/S | 5 Sep, 2012 | Fairy Cave Quarry | |||
The Bristolian Affair | VS 4c | Lead O/S | 5 Sep, 2012 | Fairy Cave Quarry | |||
Lumbar Puncture | E2 5b * | Lead O/S | 5 Sep, 2012 | Fairy Cave Quarry | |||
Halfway to Kansas | HS 4a | Lead O/S | 5 Sep, 2012 | Fairy Cave Quarry | |||
Balch's Slide | HS 4a * | Lead O/S | 4 Sep, 2012 | Fairy Cave Quarry | |||
Equals Not | VS 4b | Lead O/S | 4 Sep, 2012 | Fairy Cave Quarry | |||
Back to Sandy Lane | VD | Lead O/S | 4 Sep, 2012 | Fairy Cave Quarry | |||
Owl Wall (P2) | HS 4a * | Lead O/S | 19 Aug, 2012 | Pot Hole Quarry (Three... | |||
Mango | HS 4a * | Lead O/S | 19 Aug, 2012 | Pot Hole Quarry (Three... | |||
Starting Block | HVS 4c | TR | 11 Aug, 2012 | Twilight Area | |||
Brown Cracks | S 3c | Lead | 8 Aug, 2012 | World's End |