Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Beckermet Slab | HVD 4a * | Lead O/S | Hev, Joe, Noah | 13 Sep, 2020 | Roaches Upper Tier | ||
Rooster | HVD * | Lead O/S | Hev, Joe, Noah | 13 Sep, 2020 | Roaches Upper Tier | ||
Wall End Slab | VS 5a *** | Lead O/S | Hev, Joe, Noah | 30 Aug, 2020 | Stanage Plantation | ||
Hollybush Gully Right | VD ** | Lead O/S | Hev, Joe, Noah | 30 Aug, 2020 | Stanage Plantation | ||
Corduroy | VS 4c | Lead O/S | Hev, Joe, Noah | 30 Aug, 2020 | Stanage Plantation | ||
Stirrup | S 3c | Lead O/S | Hev, Joe, Noah | 30 Aug, 2020 | Stanage Plantation | ||
Three Steps to Heaven | S 4a | Lead O/S | Hev, Joe, Noah | 30 Aug, 2020 | Stanage Plantation | ||
Slab Recess Direct | HS 4c * | Lead | Titanslayer | 15 Aug, 2020 | Froggatt Edge | ||
Allen's Slab | S 4a ** | Solo | Hev, Joe, Noah | 15 Aug, 2020 | Froggatt Edge | ||
Gamma | VD | Solo | Hev, Joe, Noah | 15 Aug, 2020 | Froggatt Edge | ||
Tody's Wall | HVS 5a *** | Lead | 15 Aug, 2020 | Froggatt Edge | |||
C.M.C. Slab | HVS 5a * | Lead | Hev | 15 Aug, 2020 | Froggatt Edge | ||
Heather Wall | HVD 3b *** | Lead | Joe, Noah | 15 Aug, 2020 | Froggatt Edge | ||
Boyd's Crack | VD * | - | Hev, Joe, Noah | 10 Aug, 2020 | Stanage North | ||
Tango Buttress | HS 5a ** | - | Hev, Joe, Noah | 10 Aug, 2020 | Stanage North | ||
Tango Crack | VD * | - | Hev, Joe, Noah | 10 Aug, 2020 | Stanage North | ||
High Neb Buttress | VS 4c *** | Lead | Hev, Joe, Noah | 10 Aug, 2020 | Stanage North | ||
Solitaire | HS 4b * | Lead O/S | Hev, Joe, Noah | 6 Aug, 2020 | Ravensdale | ||
Medusa | VS 4b *** | Lead O/S | Hev, Joe, Noah | 6 Aug, 2020 | Ravensdale | ||
Emma's Dilemma | S 4a * | 2nd | Titanslayer | 3 Aug, 2020 | Birchen Edge | ||
Trafalgar Crack | VD 4a * | Lead | Titanslayer | 3 Aug, 2020 | Birchen Edge | ||
Captain's Bunk | HS 4b * | Lead | Titanslayer | 3 Aug, 2020 | Birchen Edge | ||
Bow-Shaped Slab | HS 4b *** | Lead O/S | Hev, Joe, Noah | 15 Aug, 2019 | Flimston Bay | ||
The Gadfly | VS 4c ** | Lead rpt | Hev, Joe, Noah | 12 Aug, 2016 | Crystal Slabs Area | ||
Razzle Dazzle | VS 4c * | Lead rpt | Hev, Joe, Noah | 15 Aug, 2015 | Crystal Slabs Area |