Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Slab and Crack Left-hand | V1 ** | Sent O/S | 4 Mar, 2013 | Roaches Lower Tier | |||
Valkyrie | VS 4c *** | Lead β | 4 Mar, 2013 | Roaches Lower Tier | |||
Allen's Slab | S 4a ** | Lead O/S | Becki moore | 2 Feb, 2013 | Froggatt Edge | ||
Motorcade | E1 5a ** | 2nd | Matt reynolds | 3 Nov, 2012 | Froggatt Edge | ||
Tody's Wall | HVS 5a *** | Lead O/S | Matt reynolds | 3 Nov, 2012 | Froggatt Edge | ||
Broken Slab | HS 4b * | TR | Trina B | 22 Sep, 2012 | Roaches Upper Tier | ||
Ash Tree Wall | S 4a ** | Lead | Trina B | 15 Sep, 2012 | Burbage North | ||
Hollyash Crack | VS 4b ** | Lead O/S | Trina B | 15 Sep, 2012 | Burbage North | ||
Knight's Move | HVS 5a *** | Lead O/S | Trina B | 15 Sep, 2012 | Burbage North | ||
Guano Gully | S 4b | Lead O/S | 11 Sep, 2012 | Roaches Lower Tier | |||
Possibility | S 4a * | Lead O/S | 25 Aug, 2012 | Bamford Edge | |||
Kelly | S 4b * | 2nd | 25 Aug, 2012 | Bamford Edge | |||
Gangway Direct Start | S 4b | 2nd | 25 Aug, 2012 | Bamford Edge | |||
Ammo | S 4a | 2nd | 25 Aug, 2012 | Bamford Edge | |||
Opposite | S 4a | Lead O/S | 25 Aug, 2012 | Bamford Edge | |||
White Out | E2 5c ** | 2nd | 11 Aug, 2012 | Rivelin Edge | |||
Angle Rib | HVS 5a | Lead O/S | 11 Aug, 2012 | Rivelin Edge | |||
The Nithin | S 4a * | Lead O/S | 28 Jul, 2012 | Castle Naze | |||
Scoop Face | HVS 5a *** | Lead β | 28 Jul, 2012 | Castle Naze | |||
The Fifth Horseman | HVS 5a | Lead β | 28 Jul, 2012 | Castle Naze | |||
Luke Skywalker | 4a * | Lead O/S | 22 Jul, 2012 | Horseshoe Quarry | |||
Uranus | 3c | Lead O/S | 22 Jul, 2012 | Horseshoe Quarry | |||
Bow Ridge | VD | Solo O/S | 14 Jul, 2012 | Harborough Rocks | |||
Steep Ridge | VD * | Lead O/S | 14 Jul, 2012 | Harborough Rocks | |||
Concave Wall | HVD 4a * | Lead O/S | 14 Jul, 2012 | Harborough Rocks |