Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Cave Arête | HVS 5a ** | Lead | Anita Reynolds | 28 Sep, 2013 | Stanage Popular | ||
Lucy's Joy | E1 5b | TR | 28 Sep, 2013 | Stanage Popular | |||
Twin Chimneys Buttress | VS 4c ** | Lead | Anita Reynolds | 28 Sep, 2013 | Stanage Popular | ||
Moonraker | HVS 5a *** | Lead | Sarah Welsh, David Coley | 22 Sep, 2013 | Berry Head - The Old Redoubt | ||
Goddess of Gloom | HVS 5a ** | 2nd | Sarah Welsh, David Coley | 22 Sep, 2013 | Berry Head - The Old Redoubt | ||
Sunshine | 6a * | AltLd | DCIGadget | 18 Sep, 2013 | Anstey's Cove | ||
Magical Mystery Tour | 6a+ *** | DWS O/S | 14 Sep, 2013 | Berry Head - The Old Redoubt | |||
Twang | E1 5b ** | Lead dog | 28 Aug, 2013 | Chudleigh Rocks - South Face | |||
Guy Fawkes Crack | VS 4c * | Lead | joe.mw90 | 28 Aug, 2013 | Chudleigh Rocks - South Face | ||
Pympes | VD | Lead | 25 Aug, 2013 | Roche Rock | |||
Peswora | VS 4b | TR | 25 Aug, 2013 | Roche Rock | |||
Swink Chimney | VS 4c * | Lead | 25 Aug, 2013 | Roche Rock | |||
Tregagle's Rib | VS 5a * | TR | 25 Aug, 2013 | Roche Rock | |||
NVQ in Origami | E2 5c * | TR | 25 Aug, 2013 | Roche Rock | |||
Tregagle's Buttress | HS 4b ** | Lead | 25 Aug, 2013 | Roche Rock | |||
Corner and Staircase | D * | Lead | 25 Aug, 2013 | Roche Rock | |||
The Lord Falmouth | E1 5b ** | TR | 25 Aug, 2013 | Roche Rock | |||
Porky | VS 4c ** | Lead | 25 Aug, 2013 | Roche Rock | |||
Moping Owl | VS 4c * | TR | 25 Aug, 2013 | Roche Rock | |||
South East Buttress | VD ** | TR | 25 Aug, 2013 | Roche Rock | |||
The Watchtower Part I | 5c S1 ** | DWS rpt | 24 Jul, 2013 | London Bridge | |||
Plimsoll Line | S 4a * | DWS O/S | 24 Jul, 2013 | Plimsoll Line Cliff | |||
Freddie the Frog Hits Torquay | 6b S0 * | DWS | 24 Jul, 2013 | London Bridge | |||
The Watchtower Part II | 6c+ S1 *** | DWS rpt | 24 Jul, 2013 | London Bridge | |||
Five Star Traverse Part 2 | 5c S1 * | DWS rpt | 24 Jul, 2013 | Saddle Point |