Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Crack 1 | S 4a ** | Lead O/S | 4 May, 2019 | Barmouth Slabs | |||
June Climb | D * | Lead O/S | 19 Apr, 2019 | Dovestones Edge | |||
Layback Crack | HS 4b *** | Lead O/S | 19 Apr, 2019 | Dovestones Edge | |||
Answer Crack | HVD *** | Lead O/S | 19 Apr, 2019 | Dovestones Edge | |||
Crack And Wall | S 4a * | Lead O/S | 16 Apr, 2019 | Cadshaw Rocks | |||
Split Block Climb | S 4a * | Lead O/S | 16 Apr, 2019 | Cadshaw Rocks | |||
The Slab | VD * | Lead O/S | 16 Apr, 2019 | Cadshaw Rocks | |||
Overhang Crack | VD * | Lead O/S | 16 Apr, 2019 | Cadshaw Rocks | |||
Oak Tree Chimney | VD | Lead O/S | 16 Apr, 2019 | Cadshaw Rocks | |||
Cheat | E3 5b *** | Lead dnf | 7 Apr, 2019 | Wilton 1 | |||
Cheat | E3 5b *** | TR rpt | 7 Apr, 2019 | Wilton 1 | |||
Cheat | E3 5b *** | TR O/S | 24 Mar, 2019 | Wilton 1 | |||
Scimitar | VD | Lead O/S | 24 Mar, 2019 | Wilton 1 | |||
Rambling Route | VD ** | Lead O/S | 24 Mar, 2019 | Wilton 1 | |||
Hope | VD *** | Lead | 18 Feb, 2017 | Idwal Slabs (aka Cwm Idwal) | |||
Crackstone Rib | S 4a *** | Lead O/S | 29 Aug, 2016 | Carreg Wastad | |||
Avalanche Wall | HVS 5a ** | Lead dnf | 12 Aug, 2016 | Curbar Edge | |||
Brindle Crack | HS 4b * | 2nd O/S | 12 Aug, 2016 | Curbar Edge | |||
Bel Ami | VS 4b *** | 2nd O/S | 12 Aug, 2016 | Curbar Edge | |||
Kayak | E2 5b ** | Lead β | 12 Aug, 2016 | Curbar Edge | |||
Potter's Wall | HS 4b ** | Lead O/S | 12 Aug, 2016 | Curbar Edge | |||
L'Horla | E1 5b *** | TR β | 12 Aug, 2016 | Curbar Edge | |||
Allen's Slab | S 4a ** | Lead | 3 Aug, 2016 | Froggatt Edge | |||
Heather Wall | HVD 3b *** | Lead | 3 Aug, 2016 | Froggatt Edge | |||
Pot Black | E2 5b ** | Lead O/S | 27 Jul, 2016 | Stanage Plantation |