Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
MK Original | f5 | Sent | 13 Apr, 1991 | Almscliff | |||
The High Step | f5+ | Sent | 13 Apr, 1991 | Almscliff | |||
A Climb | S 4b *** | Lead O/S | Andy Dean | 13 Apr, 1991 | Ilkley (Cow and Calf) | ||
Bird's Nest Crack | HS 4b ** | Lead O/S | Andy Dean | 13 Apr, 1991 | Almscliff | ||
Fluted Crack | S 4b * | Lead O/S | Andy Dean | 13 Apr, 1991 | Almscliff | ||
Pinnacle Flake Climb | S 4a * | Lead O/S | Andy Dean | 13 Apr, 1991 | Almscliff | ||
Gamma | VD | Solo O/S | 1 Apr, 1991 | Froggatt Edge | |||
Trafalgar Wall | S 4b ** | Solo O/S | 31 Mar, 1991 | Birchen Edge | |||
Captain's Bunk | HS 4b * | Lead O/S | Swotson | 31 Mar, 1991 | Birchen Edge | ||
Narrow Buttress | VS 4c ** | Lead O/S | 31 Mar, 1991 | Stanage Popular | |||
Skywalk | VS 4b ** | 2nd O/S | Swotson | 30 Mar, 1991 | Millstone Edge | ||
Pickpocket | VS 4c * | Solo O/S | 30 Mar, 1991 | Burbage North | |||
The Stalk | VS 4c ** | 2nd O/S | Swotson | 29 Mar, 1991 | Chee Dale Upper | ||
Italian Climb | III * | AltLd O/S | Paul Allcock | 2 Feb, 1991 | Ben Nevis | ||
An Teallach Ridge (Winter) | II *** | Solo | Jan, 1991 | An Teallach - Bidein a'... | |||
Fluted Buttress Direct | IV 5 *** | AltLd O/S | James Turner | Jan, 1991 | Cairn Gorm - Stob Coire an... | ||
Taoiseach | VS 4c * | AltLd O/S | 1991 | Fair Head | |||
Shadow Buttress A | IV 5 *** | AltLd O/S | James Turner | 1 Dec, 1990 | Lochnagar | ||
South Ridge (Winter) | I * | - | Nov, 1990 | Mullach Fraoch-Choire | |||
The Fang | HVS 5a *** | AltLd O/S | John Buckley | 17 Oct, 1990 | Craig Bwlch y Moch (Tremadog) | ||
Staircase | S * | Solo O/S | 14 Oct, 1990 | Polldubh Crags, Glen Nevis | |||
Pinnacle Ridge | S * | Solo β | 14 Oct, 1990 | Polldubh Crags, Glen Nevis | |||
Severe Crack | VS 4b | 2nd rpt | Paul Allcock | 14 Oct, 1990 | Polldubh Crags, Glen Nevis | ||
North Buttress | E1 5b * | Lead O/S | Matthew Smith | 23 Sep, 1990 | Shepherd’s Crag | ||
Cracked Arete | VS 4c ** | Lead O/S | Andy Dean | 15 Sep, 1990 | Auchinstarry Quarry |