showing 1-25
UKH
Name Grade Style Date Crag name
Chimney Crack M * Lead O/S 28 Jun, 2015 Tryfan Fach (Little Tryfan)
Comfort Zone 5a * Lead O/S 28 Jun, 2015 Bus Stop Quarry
Jenga 4c * Lead O/S 28 Jun, 2015 Bus Stop Quarry
Jagged Face 4a * Lead O/S 28 Jun, 2015 Bus Stop Quarry
The Big Easy 4b * Lead O/S 28 Jun, 2015 Bus Stop Quarry
First Stop 5a * 2nd O/S 28 Jun, 2015 Bus Stop Quarry
Alison Rib D *** Solo β 1 Jun, 2015 Bosigran
Bosigran Ridge a.k.a Commando Ridge VD *** AltLd β 1 Jun, 2015 Bosigran Ridge Area
South East Buttress VD ** 2nd O/S 31 May, 2015 Roche Rock
Corner & Staircase D * Lead O/S 31 May, 2015 Roche Rock
Hope VD *** 2nd O/S 26 May, 2015 Idwal Slabs (aka Cwm Idwal)
TRF 4a Lead O/S 24 May, 2015 Castle Inn Quarry
One Fine Day 3a Lead O/S 24 May, 2015 Castle Inn Quarry
Madam Butterfly 4c Lead 24 May, 2015 Castle Inn Quarry
Mynydd Marian VS 4c * 2nd O/S 24 May, 2015 Castle Inn Quarry
Indian summer 6a+ * 2nd O/S 24 May, 2015 Castle Inn Quarry
comeback kid 4a Lead O/S 24 May, 2015 Castle Inn Quarry
Easy Peasy 3a Lead O/S 24 May, 2015 Castle Inn Quarry
Wogs HVD *** 2nd β 12 Apr, 2015 Chudleigh Rocks
Salome S 4a * Lead β 12 Apr, 2015 Chudleigh Rocks
Pinnacle Buttress VD ** Lead O/S 10 Apr, 2015 The Dewerstone
Mucky Gully D ** Lead β 10 Apr, 2015 The Dewerstone
Humbug HS 4b * 2nd O/S 4 Apr, 2015 Limekilns
Grasp the Nettle E2 5b ** TR dog 4 Apr, 2015 Limekilns
Red Flag HS 4c * 2nd O/S 4 Apr, 2015 Limekilns