Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Sostenuto | HVS 5a ** | AltLd | 25 Aug | Gouther Crags | |||
The Fang | VS 4b *** | AltLd | 25 Aug | Gouther Crags | |||
Irony | HVS 5a ** | AltLd rpt | Ewan | 20 Aug | Quayfoot Buttress | ||
Central Pillar | E2 5b *** | AltLd O/S | Ewan | 18 Aug | Esk Buttress (Dow Crag) | ||
Midge Ridge | VS | AltLd O/S | bob pilgrem | 15 Aug | Raven Crag, Combe Ghyll | ||
Mandrake | HVS 5a *** | Lead | bob pilgrem | 14 Aug | Quayfoot Buttress | ||
The Crypt | HVS 5a ** | AltLd | bob pilgrem | 14 Aug | Quayfoot Buttress | ||
Left Wall Direct | VS 4b * | 2nd | 6 Aug | Stickle Barn Crag | |||
Main Wall Scoop | VS 4b * | Lead | 6 Aug | Stickle Barn Crag | |||
Main Wall Crack | VS 4c ** | 2nd | 6 Aug | Stickle Barn Crag | |||
Heather Groove | VS 4b * | Lead | 6 Aug | Stickle Barn Crag | |||
Side Track | VS 4c * | AltLd O/S | Ewan | 2 Aug | Heron Crag, Eskdale | ||
Gormenghast | E1 5b *** | AltLd O/S | Ewan | 2 Aug | Heron Crag, Eskdale | ||
Kleine Rinne | VS 4b ** | 2nd | Egowling1 | 7 Jul | Castle Rock of Triermain | ||
Failed Romantic | E1 5b ** | 2nd | Egowling1 | 7 Jul | Castle Rock of Triermain | ||
Gazebo | HVS 5a * | Lead | Egowling1 | 7 Jul | Castle Rock of Triermain | ||
Swing to the Right | E1 5b * | TR O/S | Georgert | 2 Jul | Raven Crag (Walthwaite) | ||
Route 2 | HS 4b *** | 2nd | Georgert | 2 Jul | Raven Crag (Walthwaite) | ||
Hardup Wall | VS 4b * | Lead | Georgert | 2 Jul | Raven Crag (Walthwaite) | ||
Enterprize | VS 4b ** | Lead | Georgert | 2 Jul | Raven Crag (Walthwaite) | ||
Golden Slipper | HVS 5a *** | AltLd rpt | bob pilgrem | 20 Jun | Pavey Ark | ||
Remembrance | HVS 5a ** | AltLd rpt | bob pilgrem | 19 Jun | Gimmer Crag | ||
Intern | E1 5b *** | AltLd rpt | bob pilgrem | 19 Jun | Gimmer Crag | ||
Assagai | HVS 5a *** | AltLd O/S | 16 Jun | Trowbarrow | |||
Coral Sea | VS 4c ** | 2nd | 16 Jun | Trowbarrow |