Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Ash Tree Wall | VS 4c | Lead O/S | 6 Jul, 2013 | Fairy Cave Quarry | |||
Lunar Landscape | VS 4b * | Lead O/S | 6 Jul, 2013 | Fairy Cave Quarry | |||
Back to Basics | VD * | Lead O/S | 6 Jul, 2013 | Fairy Cave Quarry | |||
Comes the Seth | HVS 5a | Lead O/S | 6 Jul, 2013 | Fairy Cave Quarry | |||
Bramble Whine | VS 4c * | AltLd O/S | 23 Jun, 2013 | Fairy Cave Quarry | |||
Withy Crack | HVS 5a ** | 2nd rpt | 23 Jun, 2013 | Fairy Cave Quarry | |||
Diamond Rib | HS 4a * | 2nd rpt | 15 Jun, 2013 | Meadfoot Quarry | |||
Plimsoll Line | S 4a * | Lead rpt | 15 Jun, 2013 | Plimsoll Line Cliff | |||
Triton | VS 5a ** | AltLd O/S | 15 Jun, 2013 | Daddyhole Main Cliff | |||
Second Corner | S 4a ** | 2nd O/S | 9 Jun, 2013 | Subluminal and Lighthouse... | |||
First Corner | S 4b ** | Lead O/S | 9 Jun, 2013 | Subluminal and Lighthouse... | |||
Balcony | HS 4b ** | Lead O/S | 9 Jun, 2013 | Subluminal and Lighthouse... | |||
Face | S 4a * | Lead O/S | 9 Jun, 2013 | Subluminal and Lighthouse... | |||
Curving Crack | S 4a * | 2nd O/S | 9 Jun, 2013 | Subluminal and Lighthouse... | |||
Whynot | HS 4b * | 2nd O/S | 9 Jun, 2013 | Subluminal and Lighthouse... | |||
Wessex Hangover | VS 4c ** | 2nd rpt | 8 Jun, 2013 | Cattle Troughs | |||
Mary Rose | VS 4b | Lead O/S | 8 Jun, 2013 | Cattle Troughs | |||
Grottle | VD ** | Lead rpt | 8 Jun, 2013 | Cattle Troughs | |||
Glove | VD | 2nd rpt | 8 Jun, 2013 | Cattle Troughs | |||
Withy Crack | HVS 5a ** | Lead O/S | 4 May, 2013 | Fairy Cave Quarry | |||
Halfway to Kansas | HS 4a | AltLd rpt | 4 May, 2013 | Fairy Cave Quarry | |||
Balch's Slide | HS 4a * | 2nd rpt | 4 May, 2013 | Fairy Cave Quarry | |||
Cristel Wall | VD | Lead O/S | 4 May, 2013 | Fairy Cave Quarry | |||
Even Odder Boots | HVS 5b | Lead O/S | 4 May, 2013 | Fairy Cave Quarry | |||
The Alpine Ridge | M | Solo O/S | 4 May, 2013 | Fairy Cave Quarry |