Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Anvil Chorus | VS 4c *** | AltLd | 30 Apr, 2011 | Bosigran | |||
Beaker Route | HVS 5a * | AltLd | 30 Apr, 2011 | Bosigran | |||
Little Brown Jug | VS 5a *** | AltLd | 30 Apr, 2011 | Bosigran | |||
Dialectic | HVS 5b ** | 2nd | 29 Apr, 2011 | Carn Barra | |||
Axis | VS 5a ** | 2nd | 29 Apr, 2011 | Carn Barra | |||
Aerial | VS 4c ** | AltLd | 29 Apr, 2011 | Chair Ladder | |||
Socket Wall | S 4b * | Lead | 29 Apr, 2011 | Carn Barra | |||
Nozag | VS 4c *** | Lead | 25 May, 2008 | Castle Naze | |||
Bloody Crack | S 4a | 2nd | 25 May, 2008 | Castle Naze | |||
Studio | HS 4b ** | 2nd | 25 May, 2008 | Castle Naze | |||
Pilgrim's Progress | HS 4b ** | 2nd | 25 May, 2008 | Castle Naze | |||
Scoop Face | HVS 5a *** | Lead | 25 May, 2008 | Castle Naze | |||
Prow Corner Twin Cracks | HVD 4a * | 2nd | 24 May, 2008 | Roaches Lower Tier | |||
Fern Crack | S 4b ** | 2nd | 24 May, 2008 | Roaches Upper Tier | |||
Perverted Staircase | HVS 5a | Lead | 24 May, 2008 | Roaches Upper Tier | |||
Capitol Climb | HS 4b * | 2nd | 24 May, 2008 | Roaches Upper Tier | |||
Pebbledash | HVS 5a ** | AltLd | 24 May, 2008 | Roaches Lower Tier | |||
Chudleigh Overhang | HVS 5a * | Lead | cem | 24 Mar, 2008 | Chudleigh Rocks - South Face | ||
Sloe Steel | VS 5a * | 2nd | cem | 21 Mar, 2008 | St. Loy Cliff | ||
Cave Arête Indirect | E1 5b ** | 2nd | cem | 28 Jul, 2007 | Laddow | ||
Typhoon | VS 4c ** | Lead | cem | 23 Apr, 2006 | Stanage North | ||
Inaccessible Crack | VS 4c *** | Lead | cem | 23 Apr, 2006 | Stanage North | ||
Scarlett's Wall Arête | VS 4c * | Lead | cem | 22 Jan, 2006 | Wharncliffe Crags | ||
The Corner | VS 4c | Lead | cem | 22 Jan, 2006 | Wharncliffe Crags | ||
The Nose | VS 4c * | 2nd | cem | 22 Jan, 2006 | Wharncliffe Crags |