Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
High Level Traverse | VS 4c * | Lead rpt | 18 Mar | Almscliff | |||
Central Climb | VS 4c *** | 2nd rpt | 18 Mar | Almscliff | |||
Overhanging Groove | HVS 5a *** | Lead rpt | 18 Mar | Almscliff | |||
Clematis | E2 5c * | TR β | 18 Mar | Almscliff | |||
The Main of Light | HVS 5b *** | AltLd O/S | PeteColdham | 27 Feb | Rainbow Buttress | ||
Crooked Eclipse | HVS 5a *** | AltLd O/S | PeteColdham | 27 Feb | Rainbow Buttress | ||
Rhombosis | E1 5b *** | Lead O/S | 26 Feb | Oxbow Walls | |||
The Great Divide | HVS 5a *** | 2nd O/S | 26 Feb | Oxbow Walls | |||
Oxbow | E1 5b *** | 2nd O/S | 26 Feb | Oxbow Walls | |||
El Hachame | HVS 5b *** | Lead O/S | 25 Feb | Aguerd Oudad | |||
Black Wall Crack | HVS 5b ** | Lead O/S | 25 Feb | Aguerd Oudad | |||
The Black Wall | 6b *** | Lead O/S | PeteColdham | 25 Feb | Aguerd Oudad | ||
The Shaft | HVS 5a | AltLd O/S | 23 Feb | Crag BX | |||
Pole Dancer | E1 5b *** | Lead dnf | 23 Feb | Crag BX | |||
Heavy Metal | HVS 5a | 2nd O/S | 23 Feb | Crag BX | |||
Again and Again | MVS 4b ** | AltLd O/S | 22 Feb | Tizgut Gorge (Crag R &... | |||
Salus | VS 4b ** | 2nd O/S | 22 Feb | Tizgut Gorge (Crag R &... | |||
Tangerine Dream | VS 5a ** | Lead O/S | 22 Feb | Tizgut Gorge (Crag R &... | |||
Labyrinth Ridge | VS 5a *** | AltLd O/S | PeteColdham | 20 Feb | Aylim | ||
Cannon Buttress Direct | E1 5b *** | Lead O/S | 19 Feb | Ksar Rock | |||
Solar Event | E2 5c *** | 2nd O/S | 19 Feb | Ksar Rock | |||
Jedi Groove | HVS 4c *** | Lead O/S | 19 Feb | Ksar Rock | |||
Aerobat | HVS 5b *** | AltLd O/S | 19 Feb | Ksar Rock | |||
Scimitar ridge | VS 5a *** | AltLd O/S | 18 Feb | Safinah | |||
Great Eastern | VS 5a ** | AltLd O/S | 17 Feb | Ksar Rock |