Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Borra Ring | 6a * | Lead | timreynolds | 3 Nov, 2018 | Dancing Ledge | ||
Chicago Pipe Dreaming | 6a * | Lead | timreynolds | 3 Nov, 2018 | Dancing Ledge | ||
Transparent Birthday Suit | 6a * | Lead | timreynolds | 3 Nov, 2018 | Dancing Ledge | ||
Ledgend Direct | HVS 5a ** | 2nd | timreynolds | 3 Nov, 2018 | Guillemot Ledge | ||
Tensor II | VS 5a *** | 2nd | timreynolds | 3 Nov, 2018 | Guillemot Ledge | ||
August Angie | E1 5b * | Lead | timreynolds | 3 Nov, 2018 | Guillemot Ledge | ||
The Spook | E1 5b *** | Lead O/S | timreynolds | 3 Nov, 2018 | Guillemot Ledge | ||
The Spider | E1 5b *** | Lead | R0BJ0N | 10 Oct, 2018 | Chudleigh Rocks - South Face | ||
The Smile | E1 5b *** | Lead | R0BJ0N | 26 Sep, 2018 | Lower Sharpnose Point | ||
Pressure Drop | E3 5c *** | 2nd | R0BJ0N | 26 Sep, 2018 | Spekes Mill Mouth and... | ||
Quatermass | E2 5c *** | Lead O/S | David Coley | 10 Sep, 2018 | Lundy | ||
The Fifth Appendage | E1 5b *** | Lead O/S | David Coley | 10 Sep, 2018 | Lundy | ||
American Beauty | HVS 5a *** | Lead O/S | David Coley | 9 Sep, 2018 | Lundy | ||
Immaculate Slab | HVS 5a *** | Lead O/S | David Coley | 9 Sep, 2018 | Lundy | ||
The Indy 500 | E1 5b *** | Lead O/S | David Coley | 9 Sep, 2018 | Lundy | ||
The Black Pearl | E1 5b * | Lead O/S | David Coley | 8 Sep, 2018 | Lundy | ||
The Devil's Slide | HS 4a *** | AltLd | Alastair | 7 Sep, 2018 | Lundy | ||
Admiral's Arete | E1 5a * | Lead | Alastair | 7 Sep, 2018 | Lundy | ||
Stuka, Direct | VS 4c ** | Lead | Alastair | 7 Sep, 2018 | Lundy | ||
Hurricane | HS 4a * | 2nd O/S | Alastair | 7 Sep, 2018 | Lundy | ||
Matt Black | E3 5c ** | Lead O/S | David Coley | 7 Sep, 2018 | Lundy | ||
Oesophagus | E1 5b *** | 2nd dog | 29 Aug, 2018 | Chudleigh Rocks - South Face | |||
Sarcophagus | VS 4b *** | Lead O/S | 29 Aug, 2018 | Chudleigh Rocks - South Face | |||
Combined Ops | E2 5b *** | Lead O/S | 29 Aug, 2018 | Chudleigh Rocks - South Face | |||
Revolver | E1 5b ** | Lead O/S | ash656 | 18 Jul, 2018 | Meadfoot Quarry |