Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Scoop Wall | E1 5b * | 2nd O/S | 30 Sep, 2022 | Castle Naze | |||
Moonraker | HVS 5a *** | Lead O/S | 25 Sep, 2022 | Berry Head - The Old Redoubt | |||
Bishop's Rib | E1 5b *** | Lead O/S | 24 Sep, 2022 | Chair Ladder | |||
Diocese | VS 5a *** | Lead O/S | 24 Sep, 2022 | Chair Ladder | |||
Lunakhod | HVS 5a *** | Lead O/S | 23 Sep, 2022 | Lower Sharpnose Point | |||
The Smile | E1 5b *** | Lead O/S | 23 Sep, 2022 | Lower Sharpnose Point | |||
Pedestal Route | HVD 4a *** | Lead O/S | 14 Aug, 2022 | Roaches Upper Tier | |||
Right Route | VD *** | Lead O/S | 14 Aug, 2022 | Roaches Upper Tier | |||
Boggart Left-hand | E3 6a * | 2nd β | 13 Aug, 2022 | Burbage South Edge | |||
Charlie's Crack | HVS 5b ** | 2nd O/S | 13 Aug, 2022 | Burbage South Edge | |||
Brooks' Crack | HVS 5a *** | Lead O/S | 13 Aug, 2022 | Burbage South Edge | |||
Byne's Crack | VS 4b *** | Lead O/S | 13 Aug, 2022 | Burbage South Edge | |||
Cheat | E3 5b *** | 2nd O/S | 11 Aug, 2022 | Wilton 1 | |||
Fingernail | VS 4c ** | Lead O/S | 11 Aug, 2022 | Wilton 1 | |||
Keep Arête | VS 4b ** | Lead O/S | 10 Aug, 2022 | Castle Naze | |||
Scoop Face | HVS 5a *** | Lead O/S | 10 Aug, 2022 | Castle Naze | |||
Gideon | HVS 5a ** | Lead O/S | 9 Aug, 2022 | Hobson Moor Quarry | |||
Peak Arête | E1 5a * | 2nd O/S | 9 Aug, 2022 | Hobson Moor Quarry | |||
The Cracks | HS 4c *** | Lead O/S | 6 Aug, 2022 | Dinas Mot | |||
Little Tryfan Arete | D ** | Lead O/S | 2 Aug, 2022 | Tryfan Fach [Little Tryfan] | |||
The Shape of Things to Come | E6 6b ** | TR dog | 16 Jun, 2022 | Curbar Edge | |||
Valkyrie | HVS 5a *** | Lead O/S | 16 Jun, 2022 | Froggatt Edge | |||
Studio | HS 4b ** | Lead O/S | 31 May, 2022 | Castle Naze | |||
Pod Crack | E1 6a | Lead dog | 31 May, 2022 | Castle Naze | |||
Orm and Cheep | E1 6a | TR | 31 May, 2022 | Castle Naze |